Hangzhou, ChinaBSCI · OEKO-TEX® certified

sexy lingerie manufacturer

Sexy Lingerie manufacturer

Full-range sexy lingerie production — lace sets, chemises, garter sets and more, made to your tech pack or our 200+ in-house designs.

Order across the full range or focus a capsule — sets, chemises, garters and more — with consistent grading, color matching and retail-ready packaging. We run trims, lace and elastics from OEKO-TEX® certified mills and grade every block from XS to 3XL.

Sexy Lingerie — sexy lingerie manufacturer

Product references

Sexy Lingerie gallery

Use these production directions as starting points for color, fabric, grading, hardware and packaging discussions.

Quote this category
Black lace bra brief set product photo

Black lace bra brief set

Stretch floral lace, mesh and metal sliders

Underwire bra and matching brief

Black three-piece garter set product photo

Black three-piece garter set

Stretch lace, satin elastic and garter hardware

Bra, brief and detachable garter belt

Black lace bra set sample product photo

Black lace bra set sample

Botanical lace and matched elastic

Bra and brief set with production trim

Production specification

Sexy Lingerie at a glance

MaterialsStretch lace · Mesh · Satin · Spandex
Size rangeXS–3XL · cup A–DD
MOQ100 pcs/style (OEM) — Lower MOQ negotiable for trial/repeat orders and stock styles.
Sampling lead time5–7 days
Bulk lead time25–35 days
CustomizationOEM · ODM · private label · custom logo · woven labels & hangtags · retail packaging

Materials used

Fabrics behind sexy lingerie

We source stretch lace, mesh, satin, spandex from OEKO-TEX® certified mills. Explore the material families we run for this category.

Quality & compliance

Audited factory, export-ready QC

Every sexy lingerie order passes inline and final AQL inspection before shipment. Our Hangzhou factory is audited and our materials are certified for sale in regulated markets.

Quality & certifications
BSCI social-compliance auditedSedex SMETA memberISO 9001 quality managementOEKO-TEX® STANDARD 100 materials

Buyer FAQ

Sexy Lingerie — common questions

What is the MOQ for sexy lingerie?

Our standard minimum is 100 pcs/style (OEM). Lower MOQ negotiable for trial/repeat orders and stock styles.

Can you produce to our own tech pack or designs?

Yes. We offer full OEM (your tech pack), ODM (build from our 200+ in-house designs) and private label. Sampling takes 5–7 days and bulk production 25–35 days.

What sizes and materials are available for sexy lingerie?

Standard size range is XS–3XL · cup A–DD, produced in Stretch lace, Mesh, Satin, Spandex. Custom grading, colorways and material substitutions are available on request.

Are your materials and factory compliant for export?

Yes. We are BSCI, Sedex, ISO 9001, OEKO-TEX certified, with REACH, CPSIA, AZO-free dyes, California Prop 65 compliance on materials and dyes for shipment to United States, Canada, United Kingdom, European Union and beyond.

Private-label lingerie packaging and product presentation

Start a project

Get a quote for sexy lingerie

We reply to every quote request within 12 business hours.