Lingerie material
spandex lingerie manufacturer
4-way stretch bases for seamless, bodysuit and shapewear constructions.
Spandex/elastane jerseys are the stretch backbone of body-hugging lingerie — seamless bodysuits, teddies, shaping briefs and plus-size pieces all rely on 4-way stretch bases that move with the wearer and recover cleanly. We use single-jersey and warp-knit constructions with 12–25% elastane content depending on the support a style requires, and pair them with bonded or flat-lock seams for a smooth, no-show finish.
Typical uses span bodysuits, teddies, seamless briefs, shapewear-adjacent styles and the curve block. These knits are OEKO-TEX® certified, breathable and colour-fast; we grade them accurately from XS through 6X so fit stays consistent across the size run, and offer custom colours and prints for private-label programs.

Specifications
Spandex & Elastane at a glance
Indicative properties for the spandex & elastane qualities we stock and source. Exact composition, weight and finish are confirmed per style on your fabric approval.
| Common compositions | Nylon/Spandex 80/20; Polyamide/Elastane warp knit; recycled-nylon options |
|---|---|
| Weight range | 120–240 gsm |
| Stretch | 4-way, high recovery; elastane 12–25% |
| Seams | Flat-lock, bonded and seamless tubular constructions |
| Certification | OEKO-TEX® STANDARD 100, AZO-free dyes |
Where we use it
Products made with spandex & elastane
Plus-Size Lingerie
A dedicated curve block (1X–6X) with true-to-size grading across every category — a fast-growing wholesale segment.
View categoryTeddies & Bodysuits
Lace teddies, one-piece bodysuits and crotchless styles with snap closures, cut and sewn to spec.
View categoryBodystockings
Seamless and fishnet bodystockings knitted on dedicated machines — open-crotch, halter and full-body constructions.
View categoryCustomization
Nominate, match or develop your fabric
Send a reference and we will match the spandex & elastane at the right hand-feel, stretch and price — or develop a custom quality and colourway for an exclusive private-label range. Choose the production model that fits your program:

Start a project
Get a quote for spandex & elastane lingerie
We reply to every quote request within 12 business hours.