ODM design + manufacture
ODM Lingerie Manufacturer
Skip pattern-making and go straight to market. As an ODM lingerie manufacturer, we design 200+ new sexy-lingerie styles every month in-house — you pick the ones you like and we recolor, restyle and rebrand them as your collection.
No tech pack required. ODM is the fastest route from selection to shipment because the patterns, fit and production are already proven.
We reply to every quote request within 12 business hours.
Get pricing, MOQ & lead time
Tell us what you need — a specialist replies with a tailored quote.
Factory at a glance
A vertically integrated factory behind every order
17 years in the Zhejiang intimate-apparel manufacturing network, supplying 800+ B2B clients across 40+ markets.
Monthly capacity
Factory area
Sewing lines
New styles / month
Export countries
On-time delivery
Ordering terms
Clear MOQ, sampling and lead times
Transparent commercial terms so you can plan margins, timelines and cash flow before you commit. Lower MOQ negotiable for trial/repeat orders and stock styles.
We ship on FOB, CIF, DDP, EXW terms from Ningbo and Shanghai, by sea freight, air freight, express (dhl/fedex/ups).
| MOQ (ODM, per style) | 100 pcs |
|---|---|
| Sampling time | 3–5 working days |
| Sample lead time | 5–7 days |
| Bulk lead time | 25–35 days |
| Payment terms | T/T (30% deposit, 70% before shipment); L/C at sight; Trade Assurance; PayPal (samples) |
| Incoterms | FOB, CIF, DDP, EXW |
| Shipping | Sea freight, Air freight, Express (DHL/FedEx/UPS) |
| Loading ports | Ningbo, Shanghai |
What you get
Proven designs, made your own — without the development lead time
200+ new styles a month
A constantly refreshed in-house catalog of lace sets, babydolls, teddies, bodystockings and more — ready to license and brand as your own range.
No tech pack needed
Patterns, grading and sampling already exist. You choose from the catalog; we adapt and produce. Ideal for buyers without a design team.
Restyle & recolor
Change colorways, trims, lace, straps and packaging to make a stock design distinctly yours while keeping the proven fit.
Faster to market
Because development is done, you reach shelf weeks sooner. Sampling in 5–7 days, bulk in 25–35 days.
Exclusivity options
Negotiate regional or channel exclusivity on selected styles so your competitors can't buy the same look.
Your brand, our designs
Apply your labels, hangtags and packaging on top of our designs — an ODM + private-label combination in one order.
Quality & compliance
Audit-ready production buyers can trust
Every order runs through in-line and final AQL inspection, with full export documentation. Our factory is audited and our materials certified for the standards your market requires.
BSCI
BSCI social-compliance audited
Sedex
Sedex SMETA member
ISO 9001
ISO 9001 quality management
OEKO-TEX
OEKO-TEX® STANDARD 100 materials
Product range
Every sexy-lingerie category, one supplier
Sexy Lingerie
Full-range sexy lingerie production — lace sets, chemises, garter sets and more, made to your tech pack or our 200+ in-house designs.
XS–3XL · cup A–DD · MOQ 100 pcs/style (OEM)Lace Bra Sets
Matching bra-and-brief sets in re-embroidered and Chantilly-style lace with custom hardware and colorways.
30A–40DD · MOQ 100 pcs/style (OEM)Babydolls & Chemises
Babydolls and chemises in lace, mesh and satin with adjustable straps and matching G-strings — bulk and private-label ready.
S–3XL · MOQ 100 pcs/style (OEM)Bodystockings
Seamless and fishnet bodystockings knitted on dedicated machines — open-crotch, halter and full-body constructions.
One-size & Plus · MOQ 200 pcs/styleCorsets & Bustiers
Steel-boned and lightly-boned corsets and bustiers with lacing, busk and hook-and-eye closures.
XS–4XL · MOQ 100 pcs/style (OEM)Plus-Size Lingerie
A dedicated curve block (1X–6X) with true-to-size grading across every category — a fast-growing wholesale segment.
1X–6X · MOQ 100 pcs/style (OEM)Buyer questions
Frequently asked questions
What's the difference between OEM and ODM here?
OEM means you supply the design and we manufacture it. ODM means we supply the design — from our 200+ in-house styles a month — and you rebrand and order it. ODM is faster because the development is already done.
Can I see your in-house design catalog?
Yes. Request access and a specialist shares the current season's ODM catalog with photos, size ranges and indicative pricing so you can shortlist styles for sampling.
Can I modify an ODM design?
Absolutely — recolor, change lace and trims, swap straps or hardware, and add your own packaging. Larger construction or fit changes move the project toward custom or OEM.
Can I get exclusivity on a design?
We offer regional and channel exclusivity on selected styles for committed volumes. Tell us your market and target quantities and we'll quote terms.
Other ways to work with us
Not the right model? Compare the alternatives
We support every sourcing model under one roof. Pick the one that matches how you want to buy.
Full manufacturer overview
Our complete capability — every product, model and order size in one place.
Learn moreOEM manufacturing
We make your designs — you supply the tech pack or sample.
Learn moreODM design + manufacture
Start from our 200+ in-house designs, rebranded for you.
Learn morePrivate label
Your brand on labels, hangtags and packaging.
Learn moreCustom manufacturing
Full customization of fabric, color, sizing and trims.
Learn moreWholesale supply
Buy in-stock bulk ranges from 50 pcs with fast restock.
Learn moreDropshipping
Blind, per-order fulfilment with no inventory to hold.
Learn more
Start a project
Request our ODM catalog and a quote
We reply to every quote request within 12 business hours.