
Private label · OEM · ODM · Wholesale
Private-label lingerie manufacturing for serious brands.
Develop production-ready women's lingerie with one factory team for design, sampling, materials, labels, packaging, quality control and export. Start with your tech pack or our in-house range.
- 3–5 sampling
- MOQ 100 pcs/style
- 40+ export markets
- 500K
- Pieces / month capacity
- 12,000
- Factory floor (m²)
- 200+
- New styles / month
- 40+
- Export markets
- 98%
- On-time delivery
- BSCI
- Sedex
- ISO 9001
- OEKO-TEX
Product range
A collection buyers can inspect.
Production-ready silhouettes across lace, mesh, satin, corsetry, curve and statement ranges. Each category supports custom color, trim, label and packaging development.
View the full catalog
Sexy Lingerie
XS–3XL · cup A–DD

Babydolls & Chemises
S–3XL

Bodystockings
One-size & Plus

Teddies & Bodysuits
XS–3XL

Corsets & Bustiers
XS–4XL

Lace Bra Sets
30A–40DD

Role-Play Costumes
S–3XL

Plus-Size Lingerie
1X–6X

Leather & Latex
XS–3XL

Made for brands
Choose the production model that fits your stage.
From a first test order to a scaled private-label program, the same factory team keeps product, branding and delivery decisions aligned.
How it works
From tech pack to delivered cartons
A clear, repeatable production path — so you always know what happens next and when.
- 01
Inquiry & quote
Send your tech pack, reference or target price. You receive a costed quote with MOQ and lead time.
- 02
Sampling
We pattern, cut and sew a pre-production sample to your spec for approval.
- 03
Confirmation & materials
Sign-off on fit, fabric and trims; we book OEKO-TEX® materials and lock your PO.
- 04
Bulk production
Your order runs across 18 sewing lines with in-line operator checks at every station.
- 05
QC & inspection
AQL inspection, metal detection and your label, polybag and carton marks verified.
- 06
Shipping
Booked FOB, CIF or DDP by sea, air or express with full export documents.
Material library
Texture, stretch and finish drive the product.
Compare how lace, mesh, satin, stretch bases and statement materials affect support, transparency, hand feel, color and construction.
Lace
Stretch, corded and re-embroidered laces from OEKO-TEX® certified mills.
Mesh & Fishnet
Powernet, tulle and fishnet knits for sheer and bodystocking ranges.
Satin & Silk
Stretch satin, charmeuse and silk-blends for chemises and robes.
Spandex & Elastane
4-way stretch bases for seamless, bodysuit and shapewear constructions.
Leather & Latex
Faux leather, wet-look PU and sheet latex with hardware trims.
Who we supply
A sourcing model for every route to market.
MOQ, packaging, replenishment and product-development depth change with the way you sell. We scope the program around the commercial model.
Explore industry solutionsManufacturing evidence
See how the product is actually made.
Development, material booking, sewing, inspection and packing are managed through one production flow in Hangzhou. Buyers receive measurable checkpoints rather than vague progress updates.
View factory capability


- MOQ from 100 pcs per style
- 5–7 days sample lead time
- 98% on-time delivery
- 40+ export markets
- Inline inspection plus final AQL checks
- Labels, packaging and export cartons controlled with the PO
FAQ
Common questions from buyers
Sourcing details on MOQ, samples, lead time, customization and shipping — answered up front.
What is your minimum order quantity (MOQ)?
Standard OEM MOQ is 100 pcs per style, and wholesale stock styles start at 50 pcs. Lower MOQ negotiable for trial/repeat orders and stock styles.
Can I order samples before placing a bulk order?
Yes. We make pre-production samples to your tech pack or from our in-house designs in 3–5 working days, with sample delivery in 5–7 days. Sample costs are typically credited against your bulk order.
What are your production lead times?
Bulk production runs 25–35 days after sample approval and deposit, depending on order size, fabric availability and finishing. We confirm an exact ship date on your PO.
Can you produce custom designs and add our logo and labels?
Absolutely. We support full OEM/ODM customization — your patterns, fabrics, colorways and hardware — plus private-label woven labels, hangtags, printed polybags and gift boxes so every piece ships under your brand.
Do you offer private label and dropshipping?
Yes. We private-label across every category and offer blind-shipped, one-by-one dropshipping for Shopify, Amazon and TikTok sellers, so you can launch your own brand without holding inventory.
What payment terms and shipping options do you accept?
We accept T/T (30% deposit, 70% before shipment), L/C at sight, Trade Assurance, PayPal (samples). We ship FOB, CIF, DDP, EXW by Sea freight, Air freight, Express (DHL/FedEx/UPS) from Ningbo and Shanghai, with full export documentation.

Start a project
Build the next collection with a factory team that answers clearly.
We reply to every quote request within 12 business hours.




