Lingerie material
satin lingerie supplier
Stretch satin, charmeuse and silk-blends for chemises and robes.
Satin and silk-blends bring drape, sheen and a luxurious hand to chemises, robes, slips and corset shells. We run stretch satin with a touch of elastane for fitted styles, matte and high-shine charmeuse for fluid babydolls and robes, and silk-blend qualities for premium ranges. The fabric's lustre photographs well, which makes it a favourite for e-commerce and brand hero pieces.
Common applications include chemises, kimono robes, slip dresses, bustier shells and bias-cut babydolls. Satins are dyed AZO-free to OEKO-TEX® limits and can be colour-matched, printed or piped with contrast lace. For private label we add custom woven labels and finish to retail packaging standards.

Specifications
Satin & Silk at a glance
Indicative properties for the satin & silk qualities we stock and source. Exact composition, weight and finish are confirmed per style on your fabric approval.
| Common compositions | 95/5 Polyester/Spandex stretch satin; 100% Polyester charmeuse; Silk/Spandex blends |
|---|---|
| Weight range | 70–130 gsm |
| Finishes | Matte or high-shine, anti-snag, custom Pantone, all-over print |
| Hand | Fluid drape with 2-way or 4-way stretch options |
| Certification | OEKO-TEX® STANDARD 100, REACH compliant |
Where we use it
Products made with satin & silk
Babydolls & Chemises
Babydolls and chemises in lace, mesh and satin with adjustable straps and matching G-strings — bulk and private-label ready.
View categoryCorsets & Bustiers
Steel-boned and lightly-boned corsets and bustiers with lacing, busk and hook-and-eye closures.
View categoryRole-Play Costumes
Sexy role-play and cosplay costume sets — nurse, maid, uniform and holiday themes, multi-piece and accessory-ready.
View categoryCustomization
Nominate, match or develop your fabric
Send a reference and we will match the satin & silk at the right hand-feel, stretch and price — or develop a custom quality and colourway for an exclusive private-label range. Choose the production model that fits your program:

Start a project
Get a quote for satin & silk lingerie
We reply to every quote request within 12 business hours.