
Black satin corset
Black satin, mesh and reinforced boning channels
Overbust corset with front closure
corset manufacturer
Steel-boned and lightly-boned corsets and bustiers with lacing, busk and hook-and-eye closures.
Choose steel-boned or lightly-boned constructions with lacing, busk and hook-and-eye closures. We pattern and grade corsets and bustiers in satin, brocade and mesh, with optional modesty panels, suspender loops and custom boning channels.

Product references
Use these production directions as starting points for color, fabric, grading, hardware and packaging discussions.
Production specification
Customization options
Every corsets & bustiers style can be tailored to your brand — from a finished design you supply, or co-developed from our library. Choose the production model that fits your stage.
Send your patterns, materials and grading; we cut, sew and finish to spec with your logo, labels and packaging.
OEM manufacturingStart from 200+ in-house designs, then adjust colors, lace, hardware and trims to differentiate your range.
ODM design + manufactureYour brand on every woven label, hangtag, size sticker and retail-ready box or polybag for direct-to-shelf delivery.
Private labelMaterials used
We source satin, brocade, mesh, steel boning from OEKO-TEX® certified mills. Explore the material families we run for this category.
Quality & compliance
Every corsets & bustiers order passes inline and final AQL inspection before shipment. Our Hangzhou factory is audited and our materials are certified for sale in regulated markets.
Quality & certificationsBuyer FAQ
Our standard minimum is 100 pcs/style (OEM). Lower MOQ negotiable for trial/repeat orders and stock styles.
Yes. We offer full OEM (your tech pack), ODM (build from our 200+ in-house designs) and private label. Sampling takes 5–7 days and bulk production 25–35 days.
Standard size range is XS–4XL, produced in Satin, Brocade, Mesh, Steel boning. Custom grading, colorways and material substitutions are available on request.
Yes. We are BSCI, Sedex, ISO 9001, OEKO-TEX certified, with REACH, CPSIA, AZO-free dyes, California Prop 65 compliance on materials and dyes for shipment to United States, Canada, United Kingdom, European Union and beyond.
Related products

Full-range sexy lingerie production — lace sets, chemises, garter sets and more, made to your tech pack or our 200+ in-house designs.
XS–3XL · cup A–DDMOQ 100 pcs/style (OEM)

Babydolls and chemises in lace, mesh and satin with adjustable straps and matching G-strings — bulk and private-label ready.
S–3XLMOQ 100 pcs/style (OEM)

Seamless and fishnet bodystockings knitted on dedicated machines — open-crotch, halter and full-body constructions.
One-size & PlusMOQ 200 pcs/style

Start a project
We reply to every quote request within 12 business hours.