Hangzhou, ChinaBSCI · OEKO-TEX® certified

OEM manufacturing

OEM Lingerie Manufacturer

Turn your designs into production-ready sexy lingerie. As a full-service OEM lingerie manufacturer, we cut, sew, grade and finish strictly to your tech pack, sample or sketch — your label, your patterns, your specifications.

From your first proto sample to 500,000 pieces a month across 18 sewing lines, you brief one factory and keep full ownership of your IP and designs.

We reply to every quote request within 12 business hours.

Get pricing, MOQ & lead time

Tell us what you need — a specialist replies with a tailored quote.

We reply to every quote request within 12 business hours. No obligation.

Factory at a glance

A vertically integrated factory behind every order

17 years in the Zhejiang intimate-apparel manufacturing network, supplying 800+ B2B clients across 40+ markets.

500,000 pcs

Monthly capacity

12,000 m²

Factory area

18

Sewing lines

200+

New styles / month

40+

Export countries

98%

On-time delivery

Ordering terms

Clear MOQ, sampling and lead times

Transparent commercial terms so you can plan margins, timelines and cash flow before you commit. Lower MOQ negotiable for trial/repeat orders and stock styles.

We ship on FOB, CIF, DDP, EXW terms from Ningbo and Shanghai, by sea freight, air freight, express (dhl/fedex/ups).

MOQ (OEM, per style)100 pcs
Sampling time3–5 working days
Sample lead time5–7 days
Bulk lead time25–35 days
Payment termsT/T (30% deposit, 70% before shipment); L/C at sight; Trade Assurance; PayPal (samples)
IncotermsFOB, CIF, DDP, EXW
ShippingSea freight, Air freight, Express (DHL/FedEx/UPS)
Loading portsNingbo, Shanghai

What you get

Your design, manufactured to spec — nothing changed without your sign-off

Build to your tech pack

Send a tech pack, physical sample or sketch. We pattern, grade and produce exactly to your construction, fit and finishing — no in-house design substituted in.

Sample-first workflow

Proto and pre-production samples in 5–7 days so you approve fit and quality before any bulk cutting begins.

Your IP stays yours

Designs, patterns and grading you supply remain your property. We sign NDAs and never resell your styles.

Material sourcing to match

We source the laces, mesh, satin, elastics and hardware your spec calls for — or work to your nominated mills and trims.

Full size grading

Accurate grading from XS–3XL and curve blocks, built from your base size and grade rules.

Inspected & export-ready

In-line and final AQL inspection, your woven labels and packaging, full export docs, 98% on-time delivery.

Quality & compliance

Audit-ready production buyers can trust

Every order runs through in-line and final AQL inspection, with full export documentation. Our factory is audited and our materials certified for the standards your market requires.

BSCISedexISO 9001OEKO-TEXREACHCPSIAAZO-free dyesCalifornia Prop 65

BSCI

BSCI social-compliance audited

Sedex

Sedex SMETA member

ISO 9001

ISO 9001 quality management

OEKO-TEX

OEKO-TEX® STANDARD 100 materials

Buyer questions

Frequently asked questions

What do I need to provide to start an OEM order?

Ideally a tech pack with measurements, materials and construction notes, plus an approved sample or detailed reference. A sketch with size spec is enough to begin — we develop the pattern and proto sample from there.

What is your OEM minimum order quantity?

MOQ is 100 pcs per style. Lower MOQ negotiable for trial/repeat orders and stock styles.

Will you copy or resell my designs?

No. OEM designs you supply remain your intellectual property. We sign NDAs, produce only for you, and never list your styles for other buyers.

How long from approved sample to bulk delivery?

Sampling runs 3–5 working days; bulk production is typically 25–35 days after you approve the pre-production sample and confirm the order.

Private-label lingerie packaging and product presentation

Start a project

Send your tech pack for an OEM quote

We reply to every quote request within 12 business hours.