About us
About Velora Intimates
A vertically integrated women's sexy-lingerie and intimate-apparel manufacturer in Hangzhou, Zhejiang, China — OEM, ODM, private label, and wholesale supply for brands, retailers, and distributors worldwide. Founded in 2009, we've spent 17 years turning tech packs and sketches into shippable collections for brands, retailers and distributors around the world.
Our story
From a Hangzhou workshop to a vertical factory
Velora Intimates began in 2009 in Hangzhou, Zhejiang — the heart of China's Zhejiang intimate-apparel manufacturing network, where intimate-apparel know-how runs deep across cutting, lace and fine-gauge sewing. We started small, making sexy lingerie for domestic wholesalers, and earned repeat orders the slow way: consistent fit, honest lead times and garments that survived the wash.
As overseas buyers found us, we invested in what they needed most — a real sample room, in-house lace and embroidery, a QC lab, and the audits and certificates that let brands and importers buy with confidence. Today we're a vertically integrated manufacturer, but the operating principle hasn't changed: get it right on the line, and the reorders take care of themselves.
Years manufacturing
B2B clients served
Export markets
Team members
Mission & values
How we run the factory
Our mission is simple: be the lingerie manufacturer overseas buyers can hand a program to and trust to deliver. These are the principles behind it.
Make it right on the line
Quality is built into cutting and sewing, not inspected in at the end. Trained operators, sealed samples and in-line QC come before any final check.
Say what we can actually do
We quote real MOQs, real lead times and real capacity. If a deadline or spec is a stretch, we tell you before the order, not after.
Protect your designs
Tech packs, samples and private-label work stay confidential. Vertical integration means your collection isn't passed around subcontractors.
Build long-term programs
Most of our volume is repeat business. We optimize for buyers who reorder season after season, not one-off transactions.
Milestones
17 years, step by step
- 2009
Founded in Zhejiang
Started as a small cut-and-sew workshop in Hangzhou, making sexy lingerie for domestic wholesalers.
- 2013
First export programs
Moved into OEM production for overseas brands and distributors, adding a sample room and dedicated development team.
- 2016
ISO 9001 & social-compliance audits
Formalized the quality-management system and passed BSCI and Sedex SMETA audits to meet importer due-diligence requirements.
- 2019
Vertical integration & lace capability
Brought lace application, embroidery and a QC lab in-house, expanding to a multi-line facility with OEKO-TEX® certified materials.
- 2022
800+ B2B clients across 40+ markets
Grew to serve brands, retailers and distributors worldwide with OEM, ODM, private-label and wholesale supply.
- Today
12,000 m² · 500K pcs/month
A vertically integrated lingerie manufacturer running 18 sewing lines with 98% on-time delivery.
What we do
One factory, every production model
Whether you bring a finished tech pack or start from our in-house designs, we can take your range from sample to shipment under the model that fits your business.
OEM manufacturing
Learn moreODM design + manufacture
Learn morePrivate label
Learn moreCustom manufacturing
Learn moreWholesale supply
Learn moreDropshipping
Learn moreExplore the full sexy lingerie product range, or see how we safeguard quality and compliance and what runs inside our lingerie factory.
Where we ship
Trusted by buyers in 40+ markets
From independent labels to established retail brands, our clients export to:

Start a project
Work with a lingerie manufacturer you can build on
We reply to every quote request within 12 business hours.