Hangzhou, ChinaBSCI · OEKO-TEX® certified

Private label

Private Label Lingerie

Put your brand on every detail. With our private label lingerie service, we build your identity into production — woven labels, printed care tags, branded hangtags, polybags and gift boxes — so each piece ships as unmistakably yours.

Start from our designs or your own; either way the finished product carries your name, not ours, with no reference to the factory anywhere in the packaging.

We reply to every quote request within 12 business hours.

Get pricing, MOQ & lead time

Tell us what you need — a specialist replies with a tailored quote.

We reply to every quote request within 12 business hours. No obligation.

Factory at a glance

A vertically integrated factory behind every order

17 years in the Zhejiang intimate-apparel manufacturing network, supplying 800+ B2B clients across 40+ markets.

500,000 pcs

Monthly capacity

12,000 m²

Factory area

18

Sewing lines

200+

New styles / month

40+

Export countries

98%

On-time delivery

Ordering terms

Clear MOQ, sampling and lead times

Transparent commercial terms so you can plan margins, timelines and cash flow before you commit. Lower MOQ negotiable for trial/repeat orders and stock styles.

We ship on FOB, CIF, DDP, EXW terms from Ningbo and Shanghai, by sea freight, air freight, express (dhl/fedex/ups).

MOQ (private label, per style)100 pcs
Sampling time3–5 working days
Sample lead time5–7 days
Bulk lead time25–35 days
Payment termsT/T (30% deposit, 70% before shipment); L/C at sight; Trade Assurance; PayPal (samples)
IncotermsFOB, CIF, DDP, EXW
ShippingSea freight, Air freight, Express (DHL/FedEx/UPS)
Loading portsNingbo, Shanghai

What you get

Your brand, built into every garment and carton

Custom woven & printed labels

Main woven labels, satin or printed care/content labels and size tabs to your artwork, sewn into every piece.

Branded hangtags & trims

Hangtags, string seals, stickers and tissue to your logo and color — the retail-ready finishing buyers expect.

Custom packaging

Polybags, header cards, gift boxes and mailer cartons designed and printed with your branding for shelf or e-commerce.

Barcodes & compliance labels

EAN/UPC barcodes, country-of-origin, fiber-content and care labeling formatted to your destination market.

Design-flexible

Combine private labeling with our ODM catalog or your OEM tech packs — one order, fully branded.

No factory traces

Nothing in the packaging or labeling references Velora. Your customers see only your brand.

Quality & compliance

Audit-ready production buyers can trust

Every order runs through in-line and final AQL inspection, with full export documentation. Our factory is audited and our materials certified for the standards your market requires.

BSCISedexISO 9001OEKO-TEXREACHCPSIAAZO-free dyesCalifornia Prop 65

BSCI

BSCI social-compliance audited

Sedex

Sedex SMETA member

ISO 9001

ISO 9001 quality management

OEKO-TEX

OEKO-TEX® STANDARD 100 materials

Buyer questions

Frequently asked questions

What branding can you apply?

Woven main labels, printed care/content labels, size tabs, hangtags, string seals, polybags, header cards, gift boxes and mailer cartons — all to your artwork. We can also apply EAN/UPC barcodes.

Do you provide the label and packaging artwork?

You supply your logo and brand assets; our team prepares print-ready label and packaging layouts for your approval. We advise on compliant care/content labeling for your market.

Is there a minimum for custom labels and packaging?

Garment MOQ is 100 pcs per style. Label and trim suppliers have their own minimums, which we consolidate; we'll confirm exact figures with your quote.

Will my packaging reference the factory?

No. Private-label orders are fully blind — no Velora name, address or markings appear on the product, labels or packaging.

Private-label lingerie packaging and product presentation

Start a project

Build your private-label lingerie brand

We reply to every quote request within 12 business hours.